contact
Omni Marker
Installation Cross-Section by Product
Marker Ball installation depth up to 1.5 m from ground level
· Installed at minimum intervals of 10–20 m, and easy to install as horizontal leveling is not required.
Installation Photos

Excavation

Pipeline Installation

Marker Ball Installation

Depth Measurement

Sensor Installation After Backfilling

Post-Installation Device Test

Post-Installation Device Test

Spike Marker
Installation Cross-Section by Product
Spike Marker installation depth up to 1 m from ground level
Installation Photos

Core Drilling

Spike Marker Insertion

Road Surface After Construction

Post-Installation Device Test

To Contact